Stellar Resources Ltd (ASX:SRZ, OTC:SLROF) managing director Simon Taylor joins Proactive’s Tylah Tully to talk through a record high-grade tin intersection received from the Heemskirk Project. The intersection of 20.9 metres at 1.97% tin came from the Severn deposit within the Heemskirk Tin Project in Western Tasmania. This result is from an ongoing drilling program targeting infill and extensional drilling across 24 holes spanning 9,500 metres at the Severn and Queen Hill deposits. To date, eight holes totalling more than 3,600 metres have been completed. The standout intersection in drill hole ZS166 included multiple high-grade zones, including 14.8 metres at 2.40% tin and 5.9 metres at 3.36% tin. The mineralisation remains open down plunge, with further exploration planned. Another drill hole at Queen Hill, ZQ165, identified a northern extension with 4 metres at 0.52% tin. These results have returned significantly higher grade and thickness than predicted by the current mineral resource model and will feed into a prefeasibility study now underway. The company is also preparing geophysical surveys for December to further expand resources. Taylor highlighted the potential for substantial resource growth, emphasising progress on prefeasibility, environmental studies and resource upgrades. Further updates on drilling, ore sorting and metallurgical results are expected as the project advances. #ProactiveInvestors #StellarResources #ASX #TinMining #HeemskirkTinProject #MiningAustralia #ExplorationDrilling #TinDiscovery #SevernDeposit #MineralResources #MiningNews #TasmaniaMining #HighGradeTin #ResourceExpansion #MiningExploration #PrefeasibilityStudy #MetallurgicalResults #ElectromagneticSurvey #MiningInvestment #MiningProjects #ResourceUpgrade #SustainableMining