Proactive - Interviews for investors

Just the Facts: Brightstar Resources records high-grade gold results at Sandstone

Episode Summary

Proactive’s Tylah Tully breaks down ‘Just the facts’ of the latest news from Brightstar Resources Ltd (ASX:BTR). Brightstar has announced final results from its 6,000-metre reverse circulation (RC) drilling program at the Sandstone Gold Project in Western Australia’s Murchison region. The program targeted the Montague-Boulder and Whistler deposits, with key intercepts including 4 metres at 59 g/t gold at Whistler and 2 metres at 33.7 g/t gold at Montague-Boulder. The Whistler program, totalling ~3,300 metres, focused on infill drilling below the existing open pit to improve resource classification and included extensional drilling to test mineralisation at its northern and southern extents. Significant results include 5 metres at 7.64 g/t gold and 9 metres at 7.16 g/t gold. The Montague-Boulder program (~2,800 metres) explored extensions of the deposit, uncovering high-grade mineralised shoots, including 1 metre at 66.7 g/t gold and 7 metres at 5.39 g/t gold. Brightstar has also commenced its 2025 drilling campaign at the Lord Nelson and Vanguard North deposits, aiming to expand the Sandstone Gold Project’s 1.5-million-ounce mineral resource base. Drilling has resumed at the Lord Nelson deposit, with additional results expected as pending assays from the 2024 drill season are finalised. The company continues exploration alongside development of the Fish underground mine at the Laverton Hub. #ProactiveInvestors #BrightstarResources, #GoldMining, #SandstoneProject, #GoldExploration, #RCDrilling, #HighGradeGold, #AustraliaMining, #WesternAustralia, #MontagueBoulder, #WhistlerDeposit, #LordNelson, #GoldProjects, #MineralResources, #MiningUpdates, #GoldAssays, #ExplorationDrilling, #GoldInvesting, #FeasibilityStudy, #MiningIndustry, #Brightstar